Construction Opportunities
Below is a list of upcoming planned construction and construction-related projects.
- The list is provided for informational purposes only.
- LLNS reserves the right to change or cancel any project at any time.
- The presence or absence of a project on this list does not obligate LLNS to take any action.
Last Updated: Nov 5 2024
Details
Project Categories
Design Only, Design-Build, Design-Bid-Build
- For most DBB projects, the estimated start date reflects the anticipated Design scope RFP issuance date.
- The Build RFP is typically issued 9 to 12 months after the design RFP.
Details
Project Assignment and Selection
- Projects may be assigned for competition among Master Task Agreement holders or released for open competition, as determined by LLNS.
- Suppliers are welcome to express interest in projects, to be considered for receiving a Request for Information (RFI) or Request for Proposal (RFP).
- Please note that an expression of interest does not guarantee an invitation to bid.
- LLNS employs both Best Value and Lowest Price Technically Acceptable (LPTA) award strategies, which will be specified in the RFP.
Pre-Qualification Requirements for Construction Subcontractors
In order to qualify for construction opportunities at the Lab, contractors must meet the requirements.
Detailed Information
Contact Information
To express interest or ask questions, please email:
construction1 [at] llnl.gov (construction1[at]llnl[dot]gov)
Acquisition Type | Execution Method | NAICS | Project Title | Estimated Value | Estimated Start (Quarter Starting) | Special Instructions |
---|---|---|---|---|---|---|
Construction | Build Only | 236220 | Bldg 121 Office, Hallway, and Conference Room Carpet and Paint Replacement 1300 Wing | <$2M | 10/1/2024 | Potential SBSA |
Construction | Design-Build | 238990 | Bldg 132N Main Auditorium Revitalization | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 132N Restroom and Kitchenette Countertop Replacements | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 132S Restroom and Kitchenette Countertop Replacements | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 132S Rm 1133 Upgrade | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 170 Office, Hallway, Conference Room Carpet and Paint Replacements 2nd Floor | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 235 Storage Sheds Revitalization | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 254 ES&H Fume Hood Replacements | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 541330 | Bldg 332 Paging Shake Test | <$2M | 10/1/2024 | Potential SBSA |
Construction | Design-Bid-Build | 236220 | Bldg 361 Room 1575 BSL2 Lab Conversion | >$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 361 Room 1634 Central Services Revitalization | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 361 Rooms 1530, 1536, 1530, 1530A BSL2 Lab Conversion | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 368 Containment Unit replacement | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 368 Welded Anti-microbial Flooring and Interior Paint Replacement | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 238210 | Bldg 391 Standby Generator Installation | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 238210 | Bldg 543 Auditorium Lighting Controls System | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 238990 | Bldg 842 S300 Communication Hut Replacement | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 238990 | Bldg 866 S300 Communication Hut Replacement | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 221310 | Site 200 Mechanical Utility Valve and Piping Replacement-Tier 3 | >$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 236220 | U313B Radio Building Upgrade | <$2M | 10/1/2024 | Potential SBSA |
Construction | Build Only | 237990 | 15RWPA B834 Complex Roadway Replacement | <$2M | 1/1/2025 | Potential SBSA |
Construction | Design-Build | 238910 | B212 and LS212 Demo | >$20M | 1/1/2025 | |
Construction | Design-Bid-Build | 238220 | Bldg 311 Building HVAC Upgrade - Fund 2 | >$5M | 1/1/2025 | Lower-tier under CHAMP subcontract |
Construction | Build Only | 236220 | New Employee Center | >$20M | 1/1/2025 | |
Construction | Build Only | 236220 | New Storage Facility 3600 Block | >$2M | 1/1/2025 | Potential SBSA |
Construction | Design-Build | 238210 | S300 Energy Pilot - Tier 1 | >$5M | 1/1/2025 | |
Construction | Design-Bid-Build | 238220 | B654 Cooling Upgrade | <$2M | 7/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 236220 | B654 North BDF Installation (FY25) | <$2M | 7/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 238210 | B654 Power Distribution Install/expansion (FY25) | <$2M | 7/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | 02EGU 13 Non-compliant Standby Generator Fuel Tank Replacements | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238990 | 02LAND Site 200 Landscaping-Signage-Pathway Replacements | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238990 | 02LAND Site Wide Architectural Features Replacements FY25 | <$2M | 10/1/2025 | Potential SBSA; Includes pedestrian bridges, benches, bus stop shelters, etc. |
Construction | Build Only | 236220 | 02LAND Site Wide Architectural Features Replacements FY26 | <$2M | 10/1/2025 | Potential SBSA; Includes pedestrian bridges, benches, bus stop shelters, etc. |
Construction | Design-Bid-Build | 238990 | 02PRK Bldg 543 Parking Lot Upgrade | >$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238210 | 02PRK Electric Vehicle Charging Station Expansion - Lot Z-1 | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 238990 | 15FNC Site 300 Property Protected Area Fence Replacements West | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 238990 | 15RWPA Bldg 825 / 826 Roadway Replacement | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 238990 | 15RWPA Main Roadway Route 3 Replacement | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 238990 | 15RWPA Main Roadway Route 4 Replacement | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 236220 | 8389 Network Intelligence Research Office Facility | >$20M | 10/1/2025 | |
Construction | Design-Build | 238220 | B132N ACU94 Coil Replacement | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 121 Thermostat Replacements | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 125 Canopy Installation | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238990 | Bldg 132N 1800 Suite Upgrade | >$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 132S Fume Hood Replacements | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 132S HVAC Coil and Duct Cleaning Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 132S HVAC Replacements ACU20, 21 | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 191 Fume Exhaust Fan Replacement FFE03 | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 191 Fume Exhaust Fan Replacements FFE05 - 08 | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238990 | Bldg 194 Network Upgrade | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 234 HVAC Replacement | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238990 | Bldg 253 Parking Lot Repaving | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 254 ES&H Fume Hoods Replacement | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238210 | Bldg 262 Interior Lighting Replacements | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 262 Pathway Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 274 Office and Hallway Carpet & Paint | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 312 Program Move and Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 316 Exterior Stairway Replacement | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 321C Mezzanine Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 236220 | Bldg 322 Waste Accumulation Area Installation | >$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 335 Office and Hallway Flooring and Paint Replacements | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238210 | Bldg 341 Rm 1033 Emergency Power Installation | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Build | 236220 | Bldg 361 Rm 1155 Conversion to Advanced Imaging Lab Space | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 236220 | Bldg 361 Rooms 1942, 1946, and 1947 BSL2 Lab Conversion | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 365 (BSL2) Boiler Replacement BHPS01 | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 365 Chiller Replacement RCHSR01 | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Build | 238210 | Bldg 365 Generator Replacement GDE01 | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 365 HVAC Replacements | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 411 Multi Office Refurbishment - Carpet and Paint | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 411 Restroom Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 411 Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 411 Shipping Area Installation | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 432 First Floor Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238990 | Bldg 443 Storage Tent | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 471 Fan Hood Replacement | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 482 Office and Hallway Carpet and Paint Replacements 1st floor 1000 & 1100 wings | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 611Restroom Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 619 Restroom Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 6199 Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 6199A Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 663 Health Services Real Property Replacements | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Bldg 691 Space Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 693 HVAC Units Replacement | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238220 | Bldg 882 HVAC Replacements ACS01 -04 and RCA01 - 04 | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 236220 | Bldg 888 Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | Common Area Modifications | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238210 | LCW06 Site 200 LCW Usage Audit and Study | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 236220 | New SD Facility/Event Storage | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Build | 238210 | New U328 Electrical Reliability Feed | >$5M | 10/1/2025 | |
Construction | Build Only | 238220 | OS291 Mechanical Utility System Replacements (VFDs LCW) | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238990 | OS894 S300 Process Area Gate Replacement | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 238210 | OS898 West Observation Communications Tower Replacement | >$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 221310 | Site 200 CW01 Mocho Hetch Hetchy Pump Station Revitalization-Fund 2 | >$5M | 10/1/2025 | |
Construction | Design-Build | 237990 | Site 300 Bldg 843 Corp Yard Upgrade | >$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | T1713 Exterior Trailer Revitalizaion | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | T1714 Exterior Trailer Revitalizaion | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | T1730 Exterior Trailer Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | T1735 Exterior Trailer Revitalizaion | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 236220 | T2775 Office and Hallway Carpet and Paint | <$2M | 10/1/2025 | Potential SBSA |
Construction | Build Only | 238910 | T2925 Rotating Target Neutron Source Complex Disposition | <$2M | 10/1/2025 | |
Construction | Build Only | 236220 | T4728 Office Space Revitalization | <$2M | 10/1/2025 | Potential SBSA |
Construction | Design-Bid-Build | 236220 | Bldg 411 Shipping and Receiving Seismic Upgrade-Fund 2 | >$10M | 1/1/2026 | |
Construction | Design-Bid-Build | 236220 | New Site 200 Automated Materials Development Facility-Fund 2 (AMD) | >$10M | 1/1/2026 | Potential SBSA |
Construction | Design-Bid-Build | 236220 | STAR - B296 New Energetic Materials Office Facility | >$10M | 1/1/2026 | |
Construction | Design-Bid-Build | 238220 | U291 Cooling Tower Replacement-Fund 2 | >$10M | 1/1/2026 | |
Construction | Design-Bid-Build | 236220 | New Prototyping Enclave (STAR) | >$20M | 4/1/2026 | |
Construction | Design-Bid-Build | 236220 | S200 Radiological Assistance Program Facility (S200 RAP) | >$20M | 10/1/2026 | |
Construction | Design-Bid-Build | 236220 | New Site 300 EMDEC Collaboration Hub and Site Developmnet-Fund 2 | >$20M | 1/1/2027 | Potential SBSA |
Construction | Design-Bid-Build | 236220 | Bldg 170 SE Wing Revitalization-Fund 2 | >$5M | 4/1/2027 | Potential SBSA |
Construction | Design-Bid-Build | 236220 | New Integrated Bio-Resilience Laboratory (IBRL) | >$20M | 4/1/2027 | |
Construction | Design-Bid-Build | 236220 | Network Intelligence Research Laboratory Facility | >$20M | 10/1/2027 | |
Construction | Design-Build | 238210 | S300 Energy Pilot - Tier 2 | >$20M | 10/1/2027 | |
Construction | Design-Bid-Build | 238990 | Bldg 140 Water Intrusion Revitalization | >$20M | 10/1/2030 | |
Design | Design Only | 541310 | Bldg 132S R1133 Upgrade | <$2M | 10/1/2024 | |
Design | Design Only | 541310 | B132N R1610 Labs | <$2M | 1/1/2025 | |
Design | Design-Bid-Build | 541310 | Bldg 411 Shipping and Receiving Seismic Upgrade-Fund 1 | <$2M | 1/1/2025 | Potential SBSA |
Design | Design-Bid-Build | 541310 | U291 Cooling Tower Replacement-Fund 1 | <$5M | 1/1/2025 | Potential SBSA |
Design | Conceptual Design | 541310 | National Security Innovation Campus (NSIC) | >$300M | 4/1/2025 | |
Design | Design-Bid-Build | 541310 | New Prototyping Enclave (STAR) | <$2M | 4/1/2025 | |
Design | Design-Bid-Build | 541310 | New Site 200 Automated Materials Development Facility-Fund 1 (AMD) | <$2M | 4/1/2025 | Potential SBSA |
Design | Conceptual Design | 541310 | Product Realization Infrastructure for Stockpile Modernization (PRISM) | >$50M | 4/1/2025 | |
Design | Design-Bid-Build | 541310 | STAR - B296 New Energetic Materials Office Facility | <$2M | 4/1/2025 | Potential SBSA |
Design | Design Only | 541310 | B132S E-Power Upgrade | <$2M | 10/1/2025 | |
Design | Design-Bid-Build | 541310 | New Site 300 EMDEC Collaboration Hub and Site Developmnet-Fund 1 | <$2M | 10/1/2025 | Potential SBSA |
Design | Design-Bid-Build | 541310 | Bldg 170 SE Wing Revitalization-Fund 1 | <$2M | 4/1/2026 | Potential SBSA |
Design | Design-Bid-Build | 541310 | New Integrated Bio-Resilience Laboratory (IBRL) | <$2M | 4/1/2026 |