Construction Opportunities

Below is a list of upcoming planned construction and construction-related projects.

 

  • The list is provided for informational purposes only.
  • LLNS reserves the right to change or cancel any project at any time.
  • The presence or absence of a project on this list does not obligate LLNS to take any action.

      Last Updated: Nov 5 2024

Project Categories

Details

 

Project Assignment and Selection

Details

Pre-Qualification Requirements for Construction Subcontractors 

In order to qualify for construction opportunities at the Lab, contractors must meet the requirements. 

Detailed Information

Contact Information 

To express interest or ask questions, please email:

construction1 [at] llnl.gov (construction1[at]llnl[dot]gov)

Acquisition Type Execution Method NAICS Project Title Estimated Value Estimated Start (Quarter Starting) Special Instructions
Construction Build Only 236220 Bldg 121 Office, Hallway, and Conference Room Carpet and Paint Replacement 1300 Wing <$2M 10/1/2024 Potential SBSA
Construction Design-Build 238990 Bldg 132N Main Auditorium Revitalization <$2M 10/1/2024 Potential SBSA
Construction Build Only 236220 Bldg 132N Restroom and Kitchenette Countertop Replacements <$2M 10/1/2024 Potential SBSA
Construction Build Only 236220 Bldg 132S Restroom and Kitchenette Countertop Replacements <$2M 10/1/2024 Potential SBSA
Construction Build Only 236220 Bldg 132S Rm 1133 Upgrade <$2M 10/1/2024 Potential SBSA
Construction Build Only 236220 Bldg 170 Office, Hallway, Conference Room Carpet and Paint Replacements 2nd Floor <$2M 10/1/2024 Potential SBSA
Construction Build Only 236220 Bldg 235 Storage Sheds Revitalization <$2M 10/1/2024 Potential SBSA
Construction Build Only 238220 Bldg 254 ES&H Fume Hood Replacements <$2M 10/1/2024 Potential SBSA
Construction Build Only 541330 Bldg 332 Paging Shake Test <$2M 10/1/2024 Potential SBSA
Construction Design-Bid-Build 236220 Bldg 361 Room 1575 BSL2 Lab Conversion >$2M 10/1/2024 Potential SBSA
Construction Build Only 236220 Bldg 361 Room 1634 Central Services Revitalization <$2M 10/1/2024 Potential SBSA
Construction Build Only 236220 Bldg 361 Rooms 1530, 1536, 1530, 1530A BSL2 Lab Conversion <$2M 10/1/2024 Potential SBSA
Construction Build Only 236220 Bldg 368 Containment Unit replacement <$2M 10/1/2024 Potential SBSA
Construction Build Only 236220 Bldg 368 Welded Anti-microbial Flooring and Interior Paint Replacement <$2M 10/1/2024 Potential SBSA
Construction Build Only 238210 Bldg 391 Standby Generator Installation <$2M 10/1/2024 Potential SBSA
Construction Build Only 238210 Bldg 543 Auditorium Lighting Controls System <$2M 10/1/2024 Potential SBSA
Construction Build Only 238990 Bldg 842 S300 Communication Hut Replacement <$2M 10/1/2024 Potential SBSA
Construction Build Only 238990 Bldg 866 S300 Communication Hut Replacement <$2M 10/1/2024 Potential SBSA
Construction Build Only 221310 Site 200 Mechanical Utility Valve and Piping Replacement-Tier 3 >$2M 10/1/2024 Potential SBSA
Construction Build Only 236220 U313B Radio Building Upgrade <$2M 10/1/2024 Potential SBSA
Construction Build Only 237990 15RWPA B834 Complex Roadway Replacement <$2M 1/1/2025 Potential SBSA
Construction Design-Build 238910 B212 and LS212 Demo >$20M 1/1/2025
Construction Design-Bid-Build 238220 Bldg 311 Building HVAC Upgrade - Fund 2 >$5M 1/1/2025 Lower-tier under CHAMP subcontract
Construction Build Only 236220 New Employee Center >$20M 1/1/2025
Construction Build Only 236220 New Storage Facility 3600 Block >$2M 1/1/2025 Potential SBSA
Construction Design-Build 238210 S300 Energy Pilot - Tier 1 >$5M 1/1/2025
Construction Design-Bid-Build 238220 B654 Cooling Upgrade <$2M 7/1/2025 Potential SBSA
Construction Design-Bid-Build 236220 B654 North BDF Installation (FY25) <$2M 7/1/2025 Potential SBSA
Construction Design-Bid-Build 238210 B654 Power Distribution Install/expansion (FY25) <$2M 7/1/2025 Potential SBSA
Construction Build Only 236220 02EGU 13 Non-compliant Standby Generator Fuel Tank Replacements <$2M 10/1/2025 Potential SBSA
Construction Build Only 238990 02LAND Site 200 Landscaping-Signage-Pathway Replacements <$2M 10/1/2025 Potential SBSA
Construction Build Only 238990 02LAND Site Wide Architectural Features Replacements FY25 <$2M 10/1/2025 Potential SBSA; Includes pedestrian bridges, benches, bus stop shelters, etc.
Construction Build Only 236220 02LAND Site Wide Architectural Features Replacements FY26 <$2M 10/1/2025 Potential SBSA; Includes pedestrian bridges, benches, bus stop shelters, etc.
Construction Design-Bid-Build 238990 02PRK Bldg 543 Parking Lot Upgrade >$2M 10/1/2025 Potential SBSA
Construction Build Only 238210 02PRK Electric Vehicle Charging Station Expansion - Lot Z-1 <$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 238990 15FNC Site 300 Property Protected Area Fence Replacements West <$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 238990 15RWPA Bldg 825 / 826 Roadway Replacement <$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 238990 15RWPA Main Roadway Route 3 Replacement <$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 238990 15RWPA Main Roadway Route 4 Replacement <$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 236220 8389 Network Intelligence Research Office Facility >$20M 10/1/2025
Construction Design-Build 238220 B132N ACU94 Coil Replacement <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 121 Thermostat Replacements <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 125 Canopy Installation <$2M 10/1/2025 Potential SBSA
Construction Build Only 238990 Bldg 132N 1800 Suite Upgrade >$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 132S Fume Hood Replacements <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 132S HVAC Coil and Duct Cleaning Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 132S HVAC Replacements ACU20, 21 <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 191 Fume Exhaust Fan Replacement FFE03 <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 191 Fume Exhaust Fan Replacements FFE05 - 08 <$2M 10/1/2025 Potential SBSA
Construction Build Only 238990 Bldg 194 Network Upgrade <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 234 HVAC Replacement <$2M 10/1/2025 Potential SBSA
Construction Build Only 238990 Bldg 253 Parking Lot Repaving <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 254 ES&H Fume Hoods Replacement <$2M 10/1/2025 Potential SBSA
Construction Build Only 238210 Bldg 262 Interior Lighting Replacements <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 262 Pathway Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 274 Office and Hallway Carpet & Paint <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 312 Program Move and Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 316 Exterior Stairway Replacement <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 321C Mezzanine Revitalization <$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 236220 Bldg 322 Waste Accumulation Area Installation >$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 335 Office and Hallway Flooring and Paint Replacements <$2M 10/1/2025 Potential SBSA
Construction Build Only 238210 Bldg 341 Rm 1033 Emergency Power Installation <$2M 10/1/2025 Potential SBSA
Construction Design-Build 236220 Bldg 361 Rm 1155 Conversion to Advanced Imaging Lab Space <$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 236220 Bldg 361 Rooms 1942, 1946, and 1947 BSL2 Lab Conversion <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 365 (BSL2) Boiler Replacement BHPS01 <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 365 Chiller Replacement RCHSR01 <$2M 10/1/2025 Potential SBSA
Construction Design-Build 238210 Bldg 365 Generator Replacement GDE01 <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 365 HVAC Replacements <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 411 Multi Office Refurbishment - Carpet and Paint <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 411 Restroom Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 411 Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 411 Shipping Area Installation <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 432 First Floor Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 238990 Bldg 443 Storage Tent <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 471 Fan Hood Replacement <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 482 Office and Hallway Carpet and Paint Replacements 1st floor 1000 & 1100 wings <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 611Restroom Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 619 Restroom Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 6199 Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 6199A Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 663 Health Services Real Property Replacements <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Bldg 691 Space Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 693 HVAC Units Replacement <$2M 10/1/2025 Potential SBSA
Construction Build Only 238220 Bldg 882 HVAC Replacements ACS01 -04 and RCA01 - 04 <$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 236220 Bldg 888 Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 Common Area Modifications <$2M 10/1/2025 Potential SBSA
Construction Build Only 238210 LCW06 Site 200 LCW Usage Audit and Study <$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 236220 New SD Facility/Event Storage <$2M 10/1/2025 Potential SBSA
Construction Design-Build 238210 New U328 Electrical Reliability Feed >$5M 10/1/2025
Construction Build Only 238220 OS291 Mechanical Utility System Replacements (VFDs LCW) <$2M 10/1/2025 Potential SBSA
Construction Build Only 238990 OS894 S300 Process Area Gate Replacement <$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 238210 OS898 West Observation Communications Tower Replacement >$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 221310 Site 200 CW01 Mocho Hetch Hetchy Pump Station Revitalization-Fund 2 >$5M 10/1/2025
Construction Design-Build 237990 Site 300 Bldg 843 Corp Yard Upgrade >$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 T1713 Exterior Trailer Revitalizaion <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 T1714 Exterior Trailer Revitalizaion <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 T1730 Exterior Trailer Revitalization <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 T1735 Exterior Trailer Revitalizaion <$2M 10/1/2025 Potential SBSA
Construction Build Only 236220 T2775 Office and Hallway Carpet and Paint <$2M 10/1/2025 Potential SBSA
Construction Build Only 238910 T2925 Rotating Target Neutron Source Complex Disposition <$2M 10/1/2025
Construction Build Only 236220 T4728 Office Space Revitalization <$2M 10/1/2025 Potential SBSA
Construction Design-Bid-Build 236220 Bldg 411 Shipping and Receiving Seismic Upgrade-Fund 2 >$10M 1/1/2026
Construction Design-Bid-Build 236220 New Site 200 Automated Materials Development Facility-Fund 2 (AMD) >$10M 1/1/2026 Potential SBSA
Construction Design-Bid-Build 236220 STAR - B296 New Energetic Materials Office Facility >$10M 1/1/2026
Construction Design-Bid-Build 238220 U291 Cooling Tower Replacement-Fund 2 >$10M 1/1/2026
Construction Design-Bid-Build 236220 New Prototyping Enclave (STAR) >$20M 4/1/2026
Construction Design-Bid-Build 236220 S200 Radiological Assistance Program Facility (S200 RAP) >$20M 10/1/2026
Construction Design-Bid-Build 236220 New Site 300 EMDEC Collaboration Hub and Site Developmnet-Fund 2 >$20M 1/1/2027 Potential SBSA
Construction Design-Bid-Build 236220 Bldg 170 SE Wing Revitalization-Fund 2 >$5M 4/1/2027 Potential SBSA
Construction Design-Bid-Build 236220 New Integrated Bio-Resilience Laboratory (IBRL) >$20M 4/1/2027
Construction Design-Bid-Build 236220 Network Intelligence Research Laboratory Facility >$20M 10/1/2027
Construction Design-Build 238210 S300 Energy Pilot - Tier 2 >$20M 10/1/2027
Construction Design-Bid-Build 238990 Bldg 140 Water Intrusion Revitalization >$20M 10/1/2030
Design Design Only 541310 Bldg 132S R1133 Upgrade <$2M 10/1/2024
Design Design Only 541310 B132N R1610 Labs <$2M 1/1/2025
Design Design-Bid-Build 541310 Bldg 411 Shipping and Receiving Seismic Upgrade-Fund 1 <$2M 1/1/2025 Potential SBSA
Design Design-Bid-Build 541310 U291 Cooling Tower Replacement-Fund 1 <$5M 1/1/2025 Potential SBSA
Design Conceptual Design 541310 National Security Innovation Campus (NSIC) >$300M 4/1/2025
Design Design-Bid-Build 541310 New Prototyping Enclave (STAR) <$2M 4/1/2025
Design Design-Bid-Build 541310 New Site 200 Automated Materials Development Facility-Fund 1 (AMD) <$2M 4/1/2025 Potential SBSA
Design Conceptual Design 541310 Product Realization Infrastructure for Stockpile Modernization (PRISM) >$50M 4/1/2025
Design Design-Bid-Build 541310 STAR - B296 New Energetic Materials Office Facility <$2M 4/1/2025 Potential SBSA
Design Design Only 541310 B132S E-Power Upgrade <$2M 10/1/2025
Design Design-Bid-Build 541310 New Site 300 EMDEC Collaboration Hub and Site Developmnet-Fund 1 <$2M 10/1/2025 Potential SBSA
Design Design-Bid-Build 541310 Bldg 170 SE Wing Revitalization-Fund 1 <$2M 4/1/2026 Potential SBSA
Design Design-Bid-Build 541310 New Integrated Bio-Resilience Laboratory (IBRL) <$2M 4/1/2026